Our Work

Edith N. Rogers VA Mental Health Clinic Renovation

Our Work

Edith N. Rogers VA Mental Health Clinic Renovation

Our Work

Edith N. Rogers VA Mental Health Clinic Renovation

Our Work

Edith N. Rogers VA Mental Health Clinic Renovation

Healthcare facility corridor renovation with exposed HVAC ductwork and modern finishes at Edith N. Rogers VA

Location :

Bedford, MA

Client :

Edith N. Rogers Veterans Memorial Hospital (VAMC), Bedford

Project Type :

Facility Renovation

Completion Year:

2023

Project Overview

Carrigg Commercial Builders delivered a comprehensive interior renovation at the Edith N. Rogers VA Medical Center in Bedford, Massachusetts, supporting the creation of a Consolidated Mental Health Outpatient Clinic. The project involved preparing, demolishing, and reconstructing existing space within an active VA hospital to support expanded outpatient mental health services.

The work required precise coordination, strict safety controls, and close collaboration with VA stakeholders to ensure continuity of operations within a mission-critical healthcare environment.

Key Services Offered

  • Consolidate outpatient mental health services into a single, functional clinic

  • Modernize existing infrastructure to meet current VA and healthcare standards

  • Safely remove hazardous materials and outdated building components

  • Coordinate multiple trades within an active medical facility

  • Deliver a durable, efficient clinical environment with minimal disruption

Scope of Work

Carrigg’s scope included full preparation and reconstruction of the project area, beginning with demolition and abatement and continuing through complete interior build-out and systems installation.

Major scope components included:

  • Site preparation and demolition of existing structures

  • Asbestos abatement and removal of other hazardous materials

  • Removal and reconstruction of concrete flooring

  • Installation of new plumbing, mechanical, and electrical systems

  • Construction of new walls, framing, and interior finishes

  • Steel stud framing and drywall installation

  • Electrical system installation and integration

  • Review and processing of shop drawings and submittals

  • Project management, site supervision, and trade coordination

Project Execution

Carrigg maintained full control of the project through detailed planning, coordination meetings, and on-site supervision. The team managed multiple subcontractor trades while maintaining safety, quality control, cost control, and documentation standards consistent with VA requirements.

Work was carefully sequenced to align with hospital operations, ensuring compliance with all applicable codes, standards, and VA guidelines.

Results & Impact

The completed clinic provides a consolidated, modern outpatient environment designed to support patient care, provider efficiency, and long-term facility performance. Carrigg’s disciplined execution and attention to detail ensured the project was delivered safely, efficiently, and in alignment with the VA Medical Center’s mission to serve veterans.

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?