How to Read a Phasing Plan for an Occupied Facility

Color-coded floor plan and scale ruler on a table, representing phasing for an occupied facility, Carrigg Commercial Builders, Manchester, NH

Author :

Carrigg Commercial Builders

Category :

Client-Focused

Read Time :

4 min read

Date:

October 19 2026

Introduction

When a building has to keep operating during a renovation, the phasing plan is the document that decides how. It breaks the project into stages so only part of the building is affected at a time, and it shows how people, services, and construction share the same space.

For facility directors and project managers who are asked to review and approve one, knowing what to look for makes the review far more useful. This guide covers the questions worth asking.

Carrigg Commercial Builders, the Manchester, NH general contractor led by Robert Carrigg, works in occupied and mission-critical environments across New England. The guidance below is general and applies to any contractor's plan.

What a Phasing Plan Shows

A good phasing plan typically shows the order in which areas are worked on, how long each phase is expected to last, where barriers and construction access routes will be, which spaces or functions need to relocate temporarily, and when utility shutdowns are planned. It should be readable by someone who runs the building, not only by someone who builds.

Questions About Sequence

Which areas are worked on first, and why? What has to move or close before each phase begins? Are there times when the facility cannot accept disruption, such as busy operating periods or seasonal restrictions? A plan built around the building's rhythms is usually easier to follow through on than one built around the construction schedule alone.

Questions About Impact on Occupants

Where will noise, dust, and vibration be generated, and how will they be controlled? How will exits and routes through the building change in each phase, and how will occupants be told? Who is responsible for wayfinding and for answering questions from staff and visitors?

Questions About Utilities and Life Safety

Which systems will be shut down, for how long, and who approves each outage? How will fire alarm and sprinkler coverage be maintained, and what happens to any area that is temporarily unprotected? These items should be written into the plan, not left for later.

Questions About Change

What happens if a phase runs late, or if hidden conditions are found when walls are opened? A plan should say how changes are communicated and approved, and how a delay in one phase affects the next.

A phasing plan is only as good as the building staff who have reviewed it.

What This Means for Owners

Reviewing a phasing plan is one of the most practical ways an owner can reduce surprises. Carrigg Commercial Builders specializes in occupied and mission-critical construction for federal, healthcare, and commercial clients, and Bob Carrigg's team in Manchester, NH is available to talk through how phasing is typically approached on these projects.

Carrigg Commercial Builders is a Service-Disabled Veteran-Owned Small Business providing commercial construction and general contracting services throughout New England. To connect with Bob Carrigg's team, visit carrigg.com or call (603) 262-4343.

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?

Ready to Build Your
Next Project?